Temporary Bridges

We are a leader among companies specializing in investment projects with the use of temporary bridges. Over 26 years of our activity on the construction market, we have completed tens of investments including construction, maintenance for the duration of detour, and disassembly of temporary bridge structures. These tasks included making temporary structures of various types, both with modules (e.g. MS 22-80 Bailey), pontoon sets and individually prepared structures.

Temporary folding road bridge MS 22-80 (Bailey bridge)

We are in possession of a temporary folding road bridge MS 22-80, so-called Bailey bridge. The elements we have allow for construction of a passage ca. 120-140 metres long. Module construction, different configuration of grates and different lengths of crossbars and ledgers make our bridge very versatile. It is possible to construct a bridge structure with one or two roadways, with a sidewalk for pedestrians on either one or both sides, with a maintenance sidewalk or without it. Numerous intermediate supports that we have allow to use the structure as a bridge over a body of water or a watercourse, as well as over other roads.
Repeatability of elements, simple connectors, possible installation without scaffolding and support makes it incredibly quick to assemble and easy to adapt to specific conditions. Launch noses included and light weight of individual elements allow for the bridge to be installed by a team of several people, with only simple tools and an excavator or a loader. Additionally, the temporary bridge may be erected over an obstacle not only by sliding over, but also by placing on top with the use of hoisting cranes or other specialized equipment.
The parameters above make our Company's temporary folding road bridge MS 22-80 perfect as a temporary passage in case of a sudden emergency of a permanent structure, as a temporary passage for the duration of re-construction or repair works on an existing structure, or as a section of maintenance road.

mosty tymczasowe 4x4

Repeatability of elements, simple connectors, possible installation without scaffolding and support makes it incredibly quick to assemble and easy to adapt to specific conditions. Launch noses included and light weight of individual elements allow for the bridge to be installed by a team of several people, with only simple tools and an excavator or a loader. Additionally, the temporary bridge may be erected over an obstacle not only by sliding over, but also by placing on top with the use of hoisting cranes or other specialized equipment.


The parameters above make our Company's temporary folding road bridge MS 22-80 perfect as a temporary passage in case of a sudden emergency of a permanent structure, as a temporary passage for the duration of re-construction or repair works on an existing structure, or as a section of maintenance road.


Pontoon set PP-64


We have ca. 60 pontoons from PP-64 set at our disposal. The pontoons we have allow for construction of a passage ca. 200 metres long and 3.20 m wide. Module construction, different types of bank and drive-on pontoons, as well as easy transportation and installation make our pontoon set a perfect solution for constructing temporary passage through bodies of water, wherever there is no need for ensuring continuous navigation.


Scope of offered services


We provide services in building temporary bridge structures of all kinds, either with the use of module system of MS 22-80 Bailey bridge, PP-64 pontoon set, or individually manufactured constructions.


We offer help at all stages of using temporary bridge structures - from the concept, through design, cost assessment, delivery and installation of elements, to maintenance during exploitation and disassembly upon completion of exploitation.
Should you have any questions, our Production Preparation Department will gladly answer them for you.

This email address is being protected from spambots. You need JavaScript enabled to view it.